Genetic Algorithms Based on Construction Management
| AUTHOR | Norozi, Hossein; Dehghan, Shahide; Gholami, Hossein |
| PUBLISHER | LAP Lambert Academic Publishing (02/26/2024) |
| PRODUCT TYPE | Paperback (Paperback) |
Description
Today, the need for proper planning is clear in order to correctly estimate the time and cost of the project and the amount of resources needed in a project, which have a direct impact on the implementation, administration and proper exploitation of projects such as dam and building construction. In general, the management and planning of activities and resources required in a project requires various analyses, one of which is modeling and correctly predicting the cost and time of the project. Achieving this goal significantly contributes to optimal project management and decision-making in specific situations. Dynamic site placement means identifying the optimal location for temporary equipment, materials, and other temporary tools and offices available on the construction site. The location of the site is classified as a dynamic problem, because the required equipment as well as the needs of the project are constantly changing at different stages and throughout the life of the project.
Show More
Product Format
Product Details
ISBN-13:
9786207467976
ISBN-10:
6207467973
Binding:
Paperback or Softback (Trade Paperback (Us))
Content Language:
English
More Product Details
Page Count:
68
Carton Quantity:
104
Product Dimensions:
6.00 x 0.16 x 9.00 inches
Weight:
0.25 pound(s)
Country of Origin:
US
Subject Information
BISAC Categories
Technology & Engineering | Engineering (General)
Descriptions, Reviews, Etc.
publisher marketing
Today, the need for proper planning is clear in order to correctly estimate the time and cost of the project and the amount of resources needed in a project, which have a direct impact on the implementation, administration and proper exploitation of projects such as dam and building construction. In general, the management and planning of activities and resources required in a project requires various analyses, one of which is modeling and correctly predicting the cost and time of the project. Achieving this goal significantly contributes to optimal project management and decision-making in specific situations. Dynamic site placement means identifying the optimal location for temporary equipment, materials, and other temporary tools and offices available on the construction site. The location of the site is classified as a dynamic problem, because the required equipment as well as the needs of the project are constantly changing at different stages and throughout the life of the project.
Show More
Your Price
$57.00
