ISBN 9798340499653 is currently unpriced. Please contact us for pricing.
Available options are listed below:
Available options are listed below:
An Introduction to Hydraulic Barrier Field Procedures for Professional Engineers
| AUTHOR | Guyer, J. Paul |
| PUBLISHER | Independently Published (09/27/2024) |
| PRODUCT TYPE | Paperback (Paperback) |
Description
Introductory technical guidance for Professional Engineers interested in geotechnical engineering. Here is what is discussed: 1. GENERAL CONSIDERATIONS, 2. FIELD DECISIONS, 3. FIELD PREPARATION ACTIVITIES, 4. EQUIPMENT CHECKING AND EQUIPMENT CALIBRATIONS, 5. DOWNSTAGE AND UPSTAGE DRILLING AND
GROUTING PROCEDURES, 6. DRILLING OPERATIONS, 7. HOLE WASHING AFTER DRILLING., 8. PRESSURE TESTING, 9. INJECTION PRESSURES, 10. GROUTING OPERATIONS, 11. REFUSAL CRITERIA, 12. ROUTINE PROBLEMS DURING GROUTING, 13. OTHER SPECIAL ISSUES, 14. CLOSURE ANALYSES AND PROGRAM
VERIFICATION.
GROUTING PROCEDURES, 6. DRILLING OPERATIONS, 7. HOLE WASHING AFTER DRILLING., 8. PRESSURE TESTING, 9. INJECTION PRESSURES, 10. GROUTING OPERATIONS, 11. REFUSAL CRITERIA, 12. ROUTINE PROBLEMS DURING GROUTING, 13. OTHER SPECIAL ISSUES, 14. CLOSURE ANALYSES AND PROGRAM
VERIFICATION.
Show More
Product Format
Product Details
ISBN-13:
9798340499653
Binding:
Paperback or Softback (Trade Paperback (Us))
Content Language:
English
More Product Details
Page Count:
90
Carton Quantity:
36
Product Dimensions:
8.50 x 0.23 x 11.00 inches
Weight:
0.68 pound(s)
Country of Origin:
US
Subject Information
BISAC Categories
Technology & Engineering | Civil - Soil & Rock
Descriptions, Reviews, Etc.
publisher marketing
Introductory technical guidance for Professional Engineers interested in geotechnical engineering. Here is what is discussed: 1. GENERAL CONSIDERATIONS, 2. FIELD DECISIONS, 3. FIELD PREPARATION ACTIVITIES, 4. EQUIPMENT CHECKING AND EQUIPMENT CALIBRATIONS, 5. DOWNSTAGE AND UPSTAGE DRILLING AND
GROUTING PROCEDURES, 6. DRILLING OPERATIONS, 7. HOLE WASHING AFTER DRILLING., 8. PRESSURE TESTING, 9. INJECTION PRESSURES, 10. GROUTING OPERATIONS, 11. REFUSAL CRITERIA, 12. ROUTINE PROBLEMS DURING GROUTING, 13. OTHER SPECIAL ISSUES, 14. CLOSURE ANALYSES AND PROGRAM
VERIFICATION.
GROUTING PROCEDURES, 6. DRILLING OPERATIONS, 7. HOLE WASHING AFTER DRILLING., 8. PRESSURE TESTING, 9. INJECTION PRESSURES, 10. GROUTING OPERATIONS, 11. REFUSAL CRITERIA, 12. ROUTINE PROBLEMS DURING GROUTING, 13. OTHER SPECIAL ISSUES, 14. CLOSURE ANALYSES AND PROGRAM
VERIFICATION.
Show More
